Ivoire Hydro Energy secures US$29m from EAIF for the development of 44MW hydro electricity generation plant

CÔTE D’IVOIRE – Ivoire Hydro Energy (IHE) has secured €25 million (US$29.46m) from The Emerging Africa Infrastructure Fund (EAIF), a Private Infrastructure Development Group (PIDG) company, for over 18 years build a 44MW hydro electricity generation plant.

The plant will be on the Bandama River near the village of Singrobo in Côte d’Ivoire and is forecast to take some 36 months to build. Financial close is expected in late Q3 2021.

“The new facility being built at Singrobo is the country’s first hydroelectric development by an independent power producer,” Paromita Chatterjee, an Investment Director at EAIF’s managers, Ninety One, said.

“The project has seen EAIF and PIDG deliver on three core objectives; mobilising private capital, enabling economic development and contributing to increasing Africa’s stock of renewable energy infrastructure.”

A long-term power purchase agreement will see all of the energy produced by the Singrobo plant sold to Compagnie Ivoirienne d’Electricité, the operator of Côte d’Ivoire’s national grid. The new plant will be an important strategic economic asset for Côte d’Ivoire.

“The new facility being built at Singrobo is the country’s first hydroelectric development by an independent power producer.”

Paromita Chatterjee – Investment Director, Ninety One

In addition to adding to the country’s generation capacity, the plant enhances the system’s flexibility, meaning it may be called in to meet baseload demand as well as peak demand.

The African Development Bank (AfDB) acted as the mandated lead arranger of the debt finance and will be a senior lender in its own right. In addition to AfDB and EAIF, the other lenders are the German international development agency, DEG and the Africa Finance Corporation (AFC).

25% of the project cost is funded by equity from the project’s shareholders, IHE Holding, the Africa Finance Corporation and DIPFA, a Denham Capital owned international investment platform for power projects. 

Neo Themis SARL is advising and acting for the shareholders in relation to finalising the project’s development and the financing agreements.

Electrification rates in Côte d’Ivoire range from c88% in urban areas to as low as 31% in rural parts of the country. Côte d’Ivoire’s economy has been growing and diversifying since the return of political stability in 2011. It has the largest and most diversified economy in the West African Economic and Monetary Union, representing c30% of the monetary union’s total GDP.

The Project site is located on the Bandama River, 23 km downstream of the existing Taabo Dam and upstream of the confluence of the Nzi River. It is 3.5 km from the Singrobo village in the province of Taabo and some 148 km by road from Côte d’Ivoire’s capital city, Abidjan.

Liked this article? Subscribe to DealStreet Africa News, our regular email newsletter with the latest news, deals and insights from Africa’s business, economy and more. SUBSCRIBE HERE

Other Recent Posts

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.